1. shuttering to ground floor ceiling
2. still at work at sunset!
3. mezzanine level going in dorm rooms
4. rear of pool shuttering looking towards front of site

1. shuttering to ground floor ceiling
2. still at work at sunset!
3. mezzanine level going in dorm rooms
4. rear of pool shuttering looking towards front of site

| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Jun | ||||||
| 1 | 2 | 3 | 4 | |||
| 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 12 | 13 | 14 | 15 | 16 | 17 | 18 |
| 19 | 20 | 21 | 22 | 23 | 24 | 25 |
| 26 | 27 | 28 | 29 | 30 | 31 | |
Copyright © 2010 Swell Surf Camp Blog.
